
Total Solution Concept
Tokai advocates a Total Solution approach to lightning protection in order to ensure complete protection for a building’s fabric, people and electronic contents. For a design complying with relevant national or international standards, the structural lightning protection system (LPS) should be properly installed, using quality materials and fixings. This is connected to an equally well designed earth termination network, so that the lightning current successfully channeled by the LPS is safely dissipated to earth. To complete the Total Solution, thorough transient overvoltage protect should be implemented to prevent damage to the electronic system within the building.
Design & Planning
A practical design that conforms to all relevant standards is a key requirement for a project to be completed on time and on budget. Using relevant national and international standards, Tokai-Furse engineers can design and plan structural lightning protection, transient overvoltage and earthing systems and specify materials required. |
|
 |
Site Survey & Security Audit
Tokai-ATG Security Engineering Division provides a wide array of Security Solutions namely Security Engineering Audits for your facility and a fully integrated Access Control systems.
Typical application for bollards includes;
- pedestrianisation
- bus gates
- access controls
- security |
|
 |